Wow, I can't believe we're now only two weeks away from the One Room Challenge reveal!
This week there wasn't a lot of visual progress, but there was still a lot completed. We changed our minds for the third time, but we have finalized our backsplash to this oversized beveled subway tile. We like this option better than the plain subway tile we had originally planned to use since it will bring some more texture into the space. This is going up this weekend once our countertops get installed.
Speaking of countertops, after searching all over Dallas our fabricator was able to get this carrara marble remnant for us! They measured yesterday, and we're on the schedule for installation today!
Here is a close up of the floor tile. It was very affordable, and I really love its linen texture. We used a warm gray grout that we will also be using on the subway tile backsplash.
My Hicks pendant arrived this week and we'll be installing her this weekend!
I also got our water heater closet door painted. I debated about painting the vent the same color as the door, but I don't have a paint sprayer and I was worried it would look sloppy with a brush. I left it white because no one will ever see this door unless they're in the laundry room with the door shut (which will never happen). We're still waiting on the matching lever to arrive, so we have a temporary knob on here for now.
By next week everything should be installed and ready to be photographed for the big reveal in two weeks!